Roadworks on your street: how they affect you and what you can demand

Noise, dust, blocked access and months of delay. Not all of it has to be tolerated: works carry specific obligations, and there are ways to complain.

Snurkel Team · · 3 min read

Street refurbishment works with barriers and machinery
Photo: Unsplash

One morning the barriers appear. Nobody warned you, you do not know how long it will last, and your entrance is on the other side of a trench.

Much of that is unavoidable. Some of it is not.

Before they start

All works on public streets follow a procedure with points where you can intervene, and almost all occur before the machinery arrives:

  1. Project approval, at a council meeting.
  2. Public consultation, if the works are substantial. This opens the objection window, the only moment with legal effect for requesting changes.
  3. Tender and award, with the delivery period fixed by contract.
  4. Start notice to residents, which in practice each council handles as it sees fit.

Step 2 is the important one and the one almost nobody notices. By the time the barriers appear, there is minimal room to intervene.

What the works must comply with

Regardless of who carries them out, certain obligations are enforceable:

  • A visible information sign with the contractor, the commissioning body, the expected duration and usually a contact number. If it is missing, that is already a breach.
  • Pedestrian access to entrances. Vehicle access can be cut, entry to homes cannot. And the alternative route must be safe and accessible.
  • Hours set by the noise by-law. Usually 8am to 8 or 9pm on weekdays. Anything outside requires express authorisation.
  • Correct signage and lighting, including at night.
  • Dust control during demolition and earthworks.
  • Reinstating the surface on completion, to an equivalent standard.

And one that often surprises people: if the works block access to a private garage for a prolonged period, you can request a proportional refund of the access fee.

How to complain when they do not

The order matters more than the tone:

  1. Start with the number on the works sign. Many issues are resolved there the same day, with no paperwork.
  2. If not resolved, go to the council formally. With date, time, the breach and a photo. Keep the reference number, as with any reported issue.
  3. Noise outside permitted hours: local police. They can record it on the spot, and that record is the evidence that counts later.
  4. If it recurs, escalate citing earlier references. A documented history changes the response.

One practical detail: complaining on behalf of several residents, or through the residents' association, carries considerably more weight than doing it separately.

Damage and affected businesses

Two different situations:

Physical damage. If works cause a crack, burst a pipe or damage your vehicle, liability rests with the contractor or the authority. Document with dated photos, report formally as soon as possible, and do not repair anything without first recording the state.

Business losses. The hardest case. A liability claim against the authority exists, but few succeed: you must prove actual, quantifiable and individualised damage, meaning beyond the general disruption everyone endures.

If that is your situation, three things matter from day one: document turnover before and during, complain in writing from the start, and respect the one-year deadline from when the effects end. Without the first, the rest is useless.

Frequently asked questions

What hours can street works operate?

Set by the local noise by-law. Typically 8am to 8 or 9pm on weekdays, with weekend restrictions. Working outside those hours requires express authorisation.

Must they guarantee access to my building entrance?

Yes. Works can close a street to vehicles, but must maintain safe pedestrian access to entrances, accessible for people with reduced mobility.

Can a business claim for lost income due to works?

You can file a liability claim against the authority, though few succeed. Documenting turnover before and during is essential, as is respecting the one-year deadline.

Snurkel Team